{"paper_id":"2312.07733","title":"Least-Cost Structuring of 24/7 Carbon-Free Electricity Procurements","authors":["Mike Ludkovski","Saad Mouti","Glen Swindle"],"paper_date":"2023-12-12","paper_type":"empirical","paper_url":"https://arxiv.org/pdf/2312.07733v1","page_url":"https://thequant.space/flowcharts/least-cost-structuring-of-24/7-carbon-free-electricity-procu/","scores":{"empirical_rigor":8,"math_complexity":7.5,"quadrant":"Holy Grail"},"proposes":{"status":"available","statement":"The paper provides a mathematical optimization framework with probabilistic constraints for structuring carbon‑free electricity portfolios and presents two realistic case studies using fully coupled renewable scenarios.","quote":"Our contributions are two-fold: (1) we provide a mathemat-ical framework of optimization with probabilistic constraints for CFE structuring, highlighting the role of the two primary parameters of CFE target and guarantee level; (2) we present two realistic case studies where the underlying scenarios are fully probabilistically coupled and calibrated to a realistic renewable assets.","summary":"We consider the construction of renewable portfolios targeting specified carbon-free (CFE) hourly performance scores. We work in a probabilistic framework that uses a collection of simulation scenarios and imposes probability constraints on achieving the desired CFE score. In our approach there is…","strategy":null},"assumptions":{"status":"available","items":[{"assumption":"A fixed set of available carbon‑free electricity (CFE) generators is given.","type":"model","stated":"explicit","quote":"In our approach there is a fixed set of available CFE generators and a given load customer who seeks to minimize annual procurement costs.","support":"full"},{"assumption":"A collection of simulation scenarios represents potential fluctuations of loads and generators, making the realized CFE score a random variable.","type":"statistical","stated":"explicit","quote":"These scenarios represent potential fluctuations that render the realized CFE score a random variable.","support":"full"},{"assumption":"The CFE target must hold for a given large fraction (guarantee level α) of the scenarios.","type":"statistical","stated":"explicit","quote":"In line with this, we interpret the CFE target probabilistically, so that it must hold for a given (large) fraction of the scenarios.","support":"full"},{"assumption":"The piecewise‑linear function ¯R(w) can be approximated as Gaussian via the Law of Large Numbers.","type":"statistical","stated":"explicit","quote":"Arguing by the Law of Large Numbers that ¯R(w) is approximately Gaussian, one can approximate its 1 −α quantile by ˆµ(w) + Φ−1(1 −α)ˆσ(w), where ˆµ(w) and ˆσ(w) are the estimates of µ(w) = E \u0002 ¯R(w) \u0003 and σ(w) = q Var \u0000 ¯R(w) \u0001 , and Φ is the standard Gaussian CDF.","support":"full"}]},"datasets":{"status":"available","items":[{"name":"ARPA‑E PERFORM Dataset","provider":null,"kind":"other","access":"unknown","period":null,"universe":"ERCOT region renewable assets (2 solar, 2 wind, hydro)","quote":"The underlying data and asset names refer to the ERCOT region and the ARPA-E PERFORM Dataset [13].","support":"full"},{"name":"Realistic dataset of jointly calibrated solar and wind assets","provider":null,"kind":"synthetic","access":"unknown","period":null,"universe":null,"quote":"We illustrate results using a realistic dataset of jointly calibrated solar and wind assets, and compare different approaches to handling multiple loads.","support":"full"}],"known":[],"sample":{"start":null,"end":null,"market":null,"asset_class":null,"frequency":null},"data_resolution":"intraday-bars"},"transaction_costs":{"status":"not_applicable","modeled":"n/a","headline_net_of_costs":null,"detail":null,"quote":null,"source":"front_matter","rule":"R3","candidates":{"front_matter":"n/a","evidence_card":"n/a","evidence_card_quoted":false},"meaning":"the paper reports no trading or execution result"},"results":{"status":"available","evaluation_type":"none","findings":[{"finding":"The resulting procurement cost per MW of load is 74.268.","kind":"performance","quote":"The resulting procurement cost per MW of Load is P i w∗ i ci¯gi/Avet(Lt) = 74.268.","support":"full"},{"finding":"The constructed least‑cost portfolio on average procures 125.3% of load, indicating significant over‑generation.","kind":"performance","quote":"This is significantly higher than the costs in Table II due to overgeneration: the constructed least-cost portfolio π(·) on average procures 125.3% of Load.","support":"full"},{"finding":"Stronger CFE targets (higher pC) increase cost exponentially, while a higher guarantee level α adds less than 0.5% cost.","kind":"performance","quote":"Stronger CFE targets, i.e. higher pC are more costly, and so is the higher level of guarantee α. We observe that the guarantee level plays a mild role (less than 0.5% additional cost) in portfolio cost, while costs increase exponentially as CFE target pC →1.","support":"full"},{"finding":"The maximum achievable average CFE target in the given setting is 99.34%, beyond which load cannot be fully covered even with all CFE sources.","kind":"theoretical","quote":"In the given setting, the maximum achievable average CFE target is 99.34%, so that in most scenarios, even if procuring all available CFE sources, there are hours where load is not fully covered.","support":"full"}],"reported_performance":null,"out_of_sample":{"method":"none","headline_out_of_sample":null}},"independent_evidence":{"status":"none_found","supports":[],"contradicts":[],"qualifies":[],"compared_with":17,"citations":{"cited_by_in_corpus":0,"by_independent_authors":0,"how_cited":{"used_as_baseline":0,"uses_method_or_data":0,"extends":0,"discusses_findings":0,"mentions":0,"unclassified":0},"independent_papers":[],"scope":"Citations between papers in this corpus only; citations from outside it are not counted."}},"implementation":{"status":"available","public":false,"code_url":null,"note":"No repository presented by the authors as their own was found in the paper. Absence here is not proof that no code exists."},"replication":{"status":"none_found","card":null,"note":"No replication of this paper has been run by thequant.space yet."},"extraction":{"text_source":"fulltext","model":"openai/gpt-oss-120b","version":2,"extracted_at":"2026-11-14T19:59:54Z"},"provenance":{"claims":"Everything here is what the authors state in the paper. Nothing was re-run or reproduced by the platform.","quotes":"Assumptions, datasets, cost detail and findings were extracted by a language model. Every quote is verbatim paper text. Where an item has `support`, \"full\" means every figure in it appears in the quoted sentences and \"partial\" means a figure is stated elsewhere in the paper; items with a figure found nowhere in the paper were discarded.","datasets_known":"datasets.known lists well-known vendors and public datasets by a stable id, found by a dictionary over the full text where the sentence says the data is used; it is independent of the model and covers only names in the dictionary.","flags":"transaction_costs.modeled, results.evaluation_type and results.out_of_sample.method are platform classifications (structured-decision models); see https://thequant.space/score-guide/#penalty-flags","comparisons":"supports / contradicts / qualifies are a language model's reading of two papers' quoted findings, restricted to closely related papers that share no author. They are pointers to read, not verified replications, and coverage is partial.","implementation":"code_url is a repository the paper itself presents as its own (rule-scored, ambiguous cases judged by a model), checked for liveness when it was recorded."},"docs":"https://thequant.space/agents/"}