Paper: arXiv 2406.02589
Authors: Fernando Acebes, M Pereda, David Poza, Javier Pajares, Jose M Galan
Abstract
The aim of this paper is to describe a new an integrated methodology for project control under uncertainty. This proposal is based on Earned Value Methodology and risk analysis and presents several refinements to previous methodologies. More specifically, the approach uses extensive Monte Carlo simulation to obtain information about the expected behavior of the project. This dataset is exploited in several ways using different statistical learning methodologies in a structured fashion. Initially, simulations are used to detect if project deviations are a consequence of the expected variability using Anomaly Detection algorithms. If the project follows this expected variability, probabilities of success in cost and time and expected cost and total duration of the project can be estimated using classification and regression approaches.
Complexity vs Empirical Score
- Math Complexity: 3.5/10
- Empirical Rigor: 5.0/10
- Quadrant: Street Traders — practical and empirical, lighter on theory
Why this score: The paper presents an applied project management framework extending Earned Value Management (EVM) with Monte Carlo simulation and basic statistical learning (anomaly detection, classification, regression). While the mathematical derivations are light and accessible, the application of machine learning techniques to stochastic project control offers practical novelty, supported by a clear step-by-step methodology.
Research Flowchart
flowchart TD
A["Research Goal: Integrated Project Control under Uncertainty"] --> B["Data Input: Monte Carlo Simulations of Project EVM"]
B --> C["Step 1: Anomaly Detection (Statistical Learning)"]
C --> D{"Is Project Deviation Expected Variability?"}
D -- Yes --> E["Step 2: Classification & Regression Models"]
D -- No --> F["Flag Out-of-Control Risk"]
E --> G["Key Outcomes: Success Probabilities & Cost/Duration Forecasts"]
Cited References (44)
- Prediction of project outcome (2008) — link
- An Introduction to Statistical Learning: with Applications in R (2018) — link
- Novelty detection: a review—part 2: (2003) — link
- Modern Applied Statistics with S (2002) — link
- Advances in Large-Margin Classifiers (2000) — link
- The Elements of Statistical Learning: Data Mining, Inference, and Prediction (2013) — link
- ks : Kernel Density Estimation and Kernel Discriminant Analysis for Multivariate Data in R (2007) — link
- Designing project management: A scientific notation and an improved formalism for earned value calculations (2005) — link
and 36 more
- Project Performance Control in Reconstruction Projects (2000) — link
- Generalized Additive Models: An Introduction With R (2007) — link
- A model-based DSS for integrating the impact of learning in project control (2009) — link
- Evaluating fuzzy earned value indices and estimates by applying alpha cuts (2010) — link
- A fuzzy approach for the earned value management (2010) — link
- Setting tolerance limits for statistical project control using earned value management (2014) — link
- A new approach for project control under uncertainty. Going back to the basics (2013) — link
- Support Vector Machine Regression for project control forecasting (2014) — link
- Cross-validation Bandwidth Matrices for Multivariate Kernel Density Estimation (2005) — link
- An experimental evaluation of novelty detection methods (2014) — link
- Reducing over-optimism in variable selection by cross-model validation (2006) — link
- Statistical analysis for comparison of overall performance of projects using Weibull analysis on earned value metrics (2010) — link
- An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index (2010) — link
- Decision Forests: A Unified Framework for Classification, Regression, Density Estimation, Manifold Learning and Semi-Supervised Learning (2011) — link
- A model for effective implementation of Earned Value Management methodology (2003) — link
- A review of analytical models, approaches and decision support tools in project monitoring and control (2014) — link
- Novelty detection: a review—part 1: statistical approaches (2003) — link
- Cross-Validatory Choice and Assessment of Statistical Predictions (1974) — link
- A review of novelty detection (2014) — link
- A Survey of Outlier Detection Methodologies (2004) — link
- Bias in error estimation when using cross-validation for model selection (2006) — link
- The use of the area under the ROC curve in the evaluation of machine learning algorithms (1997) — link
- An Earned Schedule-based regression model to improve cost estimate at completion (2014) — link
- The Elements of Statistical Learning: Data Mining, Inference, and Prediction (2010) — link
- Modern Applied Statistics With S (2003) — link
- Probabilities for SV Machines (2000) — link
- A Review of Kernel Density Estimation with Applications to Econometrics (2012) — link
- Generalized Additive Models. (1991) — link
- Earned Value Project Management Method and Extensions (2003) — link
- Random Forests (2001) — link
- Bagging Predictors (1996) — link
- Generalized Additive Models (2017) — link
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities (2007) — link
- Bagging predictors (1996) — link
- Generalized Additive Models. (1991) — link
- Decision Forests: A Unified Framework for Classification, Regression, Density Estimation, Manifold Learning and Semi-Supervised Learning (2012) — link
0 of 44 cited works are in the corpus; resolved via arXiv source bundles, Semantic Scholar and OpenAlex. Corpus-wide: 2518 linked papers.